In this webinar we will see how Powerproject BIM, 4D BIM planning tool, allows us to analyze the status of the project by connecting the schedule to the BIM model of the project.

Please note that this webinar will be in Spanish!

Date: Thursday 2nd July | Time: 16:00 (CEST)

In the times we live in most of the works have suffered delays and shutdowns, resulting in significant losses and changes in the planning of our projects.

In this webinar we will see how Asta Powerproject BIM, 4D BIM planning tool, allows us to analyze the status of the project by connecting the schedule to the BIM model of the project.

In many occasions the BIM methodology is associated to a wrong concept; however, in the seminar we will see one of the main objectives in the commonly called “Fourth Dimension (4D)”:

1.- To show the differences of the project’s live progress with respect to the baseline.
2.- To check that the project’s schedule is in line with the construction strategy we have proposed

Delay Analysis in a 4D BIM Scheduling

time to read: 1 min